Tuesday, February 26, 2013

Back from a trip to Belize and feeling great, fresh with ideas that I need to draw out, like this one. This is Train Station X greenspace concept 6c-02. Hehe mouthfull, the design process is slow but wonderful, I'm learning so much about my process. Each drawing takes about 30 to 60 mins with 2hrs to 4hrs of confidence building procrastination.

Thursday, February 7, 2013

Added some grass, weeds and a little terrain. Allot of time at this stage spent on configuring settings or ordering masks, and color correcting of course. This frame took around 20 mins @ 2500 px. Close to animation ready? hmmmm.... Maybe If the lighting is set to animation.
Still lots of work to be done, but I'm happy with this. I want so much to integrate these assets, and I can feel it shall be soon :D

Tuesday, February 5, 2013

Trees are coming along nicely. as you can see . :) There are some other random projects I've been working on as-well. The method of late, that seems to be working is sketch 1st, 3D, 2nd. The "Cathedral" Sketches are an idea I have coming up, but the focus is the "Train Station X" which is actually coming along good.


Train-station X Green Space concept

The cartoon stuff is a freelance commission. Keeping busy these days . Lyfe is good . :)

Friday, February 1, 2013

A quick update on the train. I think this is ready for the scene